upload
George E King Consulting Inc.
Industry: Oil & gas
Number of terms: 9502
Number of blossaries: 0
Company Profile:
George King is a technology provider in the oil and gas industry specializing in new technology and problem oil well solutions.
A pressure control method for forming a pressure seal around braded line and electric line. Grease is injected between special tubes in a high pressure housing. The tubes are slightly larger than the line and grease seals the remaining area.
Industry:Oil & gas
A pressure dissolution feature in a layered reservoir, often a vertical permeability barrier.
Industry:Oil & gas
A pressure drop vs. flow study, using a computer program that compares flow performance at various “nodes” along the flow path.
Industry:Oil & gas
A pressure higher than the hydrostatic column, below the BHA produced by rapid movement of pipe into the well. Maximized in cases with large diameter tools, high viscosity and high pipe speeds. May cause fracturing. Opposite of swabbing.
Industry:Oil & gas
A pressure multiplier device use to assist pumping in high pressure well work.
Industry:Oil & gas
A pressure operated valve, placed in a gas lift mandrels at designed points in the well. The gas lift supply gas is routed through the valves into the tubing. The top valves close and the lower valves open as the static liquid level drops in the well (the well is unloaded).
Industry:Oil & gas
A pressure pulse in the mud system. Some downhole tools can be controlled by mud pulses and some data is transmitted from bottom hole to the surface via pressure pulses.
Industry:Oil & gas
A pressure relief valve that opens when temperatures increases sufficiently to melt an activation linkage.
Industry:Oil & gas
A pressure sensitive receiver that transforms sound to electrical signals that may be recorded.
Industry:Oil & gas
A pressure step-reduction choke that can be changed while actively flowing the well.
Industry:Oil & gas